吃奶摸下的激烈视频-无码人妻少妇久久中文字幕-亚洲精品成a人在线观看-高清视频在线观看一区二区三区-99久久99久久精品免费看蜜桃

Location:Home?>?detail
Location: Home?>?Core Business?>?Investment
Chengdu Metro Line 3 Project
Source:CREC Date:2018年11月27日

Phase I Project of Chengdu Metro Line 3 is “Investment & Financing + EPC + Repurchase”, with a total length of the line approximately 20.359 kilometers, all of which is underground lines. It starts from southwest at Hongpailou South Station to the north-west at Tianhuizheng South Station connecting 17 stations and including one vehicle depot (the northern suburbs vehicle depot). With a contractual investment of 6.9 billion CNY (approximately 1 billion USD), the project started in May 2012 and opened for trial operation in June 2016.

Pouring Concrete to the Bottom Plate of Section 16 in Chengdu Metro Guangdu North Station

Chengdu Metro Line 3 Project

?

?

Print Close